Civil Aviation Act, 2009 (Act No. 13 of 2009)

Regulations

Civil Aviation Regulations, 2011

Part 93 : Corporate Aviation Operations and High Performance Aircraft

Subpart 2 : Operations Personnel Requirements

Division Three : Flight time and duty limitations

93.02.15 Approval of a fatigue risk management system

Purchase cart Previous page Return to chapter overview Next page

 

(1)A CAO required to establish a fatigue risk management system shall submit a proposed fatigue risk management system to the Director for approval.

 

(2)The Director shall approve a commencement of a trial phase for implementation of a proposed fatigue risk management system referred to in subregulation (1) for a trial period of up to 36 months if the Director is satisfied that an operator has complied with prescribed requirements.

 

(3)At any time during a trial phase, the Director may withdraw an approval if it becomes evident that an operator does not comply with the provisions of a system or the regulations.

 

(4)During the trial phase the operator may implement the proposed maximum and minimum flight time and duty values, as determined by the operator and approved by the Director.

 

(5)A CAO may after a period of 24 months of approval under subregulation (2), apply to the Director for full approval by providing evidence that a fatigue risk management system is delivering required safety outcomes.

 

(6)The Director may issue a full approval to implement a fatigue risk management system if satisfied with evidence provided under subregulation (5).