Civil Aviation Act, 2009 (Act No. 13 of 2009)RegulationsCivil Aviation Regulations, 2011Part 93 : Corporate Aviation Operations and High Performance AircraftSubpart 2 : Operations Personnel RequirementsDivision Three : Flight time and duty limitations93.02.15 Approval of a fatigue risk management system |
(1) | A CAO required to establish a fatigue risk management system shall submit a proposed fatigue risk management system to the Director for approval. |
(2) | The Director shall approve a commencement of a trial phase for implementation of a proposed fatigue risk management system referred to in subregulation (1) for a trial period of up to 36 months if the Director is satisfied that an operator has complied with prescribed requirements. |
(3) | At any time during a trial phase, the Director may withdraw an approval if it becomes evident that an operator does not comply with the provisions of a system or the regulations. |
(4) | During the trial phase the operator may implement the proposed maximum and minimum flight time and duty values, as determined by the operator and approved by the Director. |
(5) | A CAO may after a period of 24 months of approval under subregulation (2), apply to the Director for full approval by providing evidence that a fatigue risk management system is delivering required safety outcomes. |
(6) | The Director may issue a full approval to implement a fatigue risk management system if satisfied with evidence provided under subregulation (5). |